
A major district road improvement project in Palakkad, the Shreekrishnapuram Road was designed to provide safer and smoother transportation for both private and commercial vehicles. The project involved widening, resurfacing, and drainage improvements, ensuring better longevity and reduced maintenance costs.


The Wayanad Churam Road, connecting Wayanad and Calicut, is a crucial highway known for its steep terrain and high traffic flow. This project focused on improving road safety by implementing anti-skid surfacing, guardrails, and improved road geometry. The road now provides a safer and more comfortable driving experience, significantly reducing travel time and accident risks.
A critical part of Kerala’s national highway infrastructure, the NH 966 Road project in Malappuram aimed to upgrade and strengthen a heavily used stretch. The improvements included new asphalt layers, extended shoulders, and enhanced drainage systems. These upgrades have significantly boosted transport efficiency and reduced congestion on this major highway.


Located in Calicut, Ferok Road is a key urban corridor that required extensive improvements due to high traffic density. The project included road resurfacing, pedestrian pathways, and traffic management solutions to improve overall mobility and reduce bottlenecks.
Connecting Malappuram and Palakkad, the SH-25 (Nattukal Road) improvement project focused on enhancing surface quality and road width to accommodate increasing traffic demands. The project incorporated high-grade bitumen surfacing, safety barriers, and road signage improvements, making it one of the most reliable inter-district highways.
